50 MW Solar Park
CLIENT: Chetak Energy
Connecting the project to the substation meant setting up around 1 km of transmission line, with the initial plan requiring nearly 60 towers. The substation also had limited space for the required electrical equipment.
Our technical team studied the existing line, load flow and substation connections to find a more efficient solution. By implementing a Line-In Line-Out (LILO) arrangement, we were able to reduce the requirement from 60 towers to just 2. We also worked around the limited substation space by optimizing the panel and equipment layout.
A 50 MW solar project successfully delivered, with a significantly simpler transmission-line connection and an optimized use of the available substation space.